+
−
Fit
LEVEL 1
Opening day
06:00
90 min left
Pause
1×
2×
4×
Sound
Movements
0
Per hour
0
On time
—
Connections
—
Safety
100
AOCC
Hub control is yours.
Bank chart
Arrivals due
Departures due
Landing capacity
Take-off capacity
09L
27R
ARRIVALS · 4,000 m
09C
27C
ARRIVALS · 3,800 m
09R
27L
DEPARTURES · 4,500 m
10L
28R
DEPARTURES · 4,000 m
10C
28C
DEPARTURES · 3,800 m
10R
28L
ARRIVALS · 4,000 m
HEAT PADS
step-aside loop, 27L
END-AROUND
no runway crossings
END-AROUND
no runway crossings
HOLDING BAYS
HOLDING BAYS
G
H
AHMEDABAD
AMD → 289°
WNW lobe faces 296°, 703 km
MUMBAI
BOM → 252°
WSW lobe faces 244°, 689 km
BENGALURU · BLR → 190°
S lobe faces 193°, 896 km
N · arrivals hall
points at Delhi
NE · domestic
security
SE · international
departures
T
A
B
C
D
E
F
BENGALURU GARDEN
BLEND
MUMBAI CEREMONIAL
ZERO MILE HALL
seven lobes; three gateways point home
THE MALL
garden valley
PHASE 2 · REMOTE STANDS AT THE PIER TIPS
PHASE 2 · REMOTE STANDS AT THE PIER TIPS
TRANSFER: INTERNATIONAL TO DOMESTIC, ABOUT 25 MIN
Arrive at an F north stand, walk to the Mall, clear the transfer centre (T) at the D/E junction:
immigration and re-screening. Then the APM to B and a short walk to a B south stand.
REMOTE STANDS
REMOTE STANDS
CARGO
MRO
FUEL
TOWER
Mumbai–Nagpur high-speed rail (proposed), in tunnel under the field
STEPWELL FORECOURT
under the 40 m cantilever
RAIL STATION BELOW
high-speed line + metro
Metro spur to the Orange Line
to Nagpur · Samruddhi Expressway
VIKRAM SARABHAI INTERNATIONAL · VSI
Master plan · 6 runways · 304 stands (168 contact + 136 remote) · 56 MARS · up to 360 aircraft parked · 6 holding bays
LEGEND
Arrival runway (default)
Departure runway (default)
One continuous roof: Hall, Mall, 12 piers (phase 1)
Phase 2: satellites G and H, pier-tip remote aprons
Automated people mover (phase 1)
People mover to G and H (phase 2)
One-way taxiway, arrow shows direction
MARS stand: one widebody or two narrowbodies
Gateway axis: from the oculus toward home
Transfer journey, F north to B south
Gardens: valleys, garden valley, courts
Stepwell forecourt under the 40 m cantilever
Rail below ground (proposed)
Holding bays · heat pads
EACH GATEWAY LOBE POINTS HOME
S lobe 193°
Bengaluru (BLR) 190°
WSW lobe 244°
Mumbai (BOM) 252°
WNW lobe 296°
Ahmedabad (AMD) 289°
N lobe 347°
arrivals hall, toward Delhi 347°
The three gateway axes meet under the oculus, at the Zero
Mile marker. Mumbai builds the roof, Bengaluru plants its
underside, Ahmedabad screens its edges.
TAXI FLOW
Outer parallels run west. In the midfield the runway-side
parallel runs west and the terminal-side parallel runs
east. The end-arounds mean no runway crossings.
STANDS
Contact: 168 stands, 40 of them MARS. Remote: 136 stands,
16 MARS. A MARS stand takes one widebody or two
narrowbodies, so up to 360 aircraft can park at once. Plus
6 holding bays.
PHASE 2 (DASHED)
Phase 2 (to 260 million passengers): two linear
satellites, G and H, replace the east remote rows; remote
stands move to the pier-tip aprons.
N
0
1 km
2 km